This job entailed renovating an entire house
. The
heating/cooling system was replaced, then the plumbing and wiring were updated. The floor was jackhammered up and re-poured with dyed concrete, then sealed. All paint, plaster, and woodwork were re-done. Finally, recycled cabinets and new countertops were installed.